FIRST BUILT-TO-SUIT FULFILMENT CENTRE DUE TO OPEN BY THE END OF 2020

It’s full on now until the opening of the UK’s latest built to suit e-commerce fulfilment centre towards the end of the year, with the super-flat DM 1 floor starting to take shape.
The exacting project requires a DM (Defined Movement) floor to ensure minimum deviation at maximum travel for the VNA forklift equipment that will service each of the 31 aisles when complete – just one of a number of features that ensure an industry leading ROI for the client, FDS Corporation Ltd.

As consumers, a third of our retail spend is now taking place online, so efficiency is paramount, highlighting the Fulfilment Centre as the beating heart of the solution.
FDS chose the Port One Logistics Park for its prime location and ease of access.
Designed by Murray Gibson Associates to accommodate sector growth and the client’s specific operating requirements, the facility will provide a seven-fold increase in storage for FDS compared with its current warehouse.

The 60-acre Port One Logistics Park has other plots available that we can design entirely and cost-effectively around your needs.

For further information contact: murray@murraygibson.com

Post Navigation